Skip to content

ENERGY STAR v3.0/3.1 training

BER Professional Certification and Training logo

ENERGY STAR v3/3.1 Online Verifier Training 

For HERS Raters, Rating Field Inspectors, Energy Modelers, and Certified Inspectors

We understand that taking time off work to attend additional training is not an option for most RESNET certified professionals. That is why we are offering Raters, RFIs and Modelers the ability to attend the ENERGY STAR v3/3.1 Rater online training.

BER's online ENERGY STAR v3/3.1 training includes:

Online/On Demand

  • Train at your own pace from the comfort of you own home
  • Eliminate missed time from work and travel costs

Features bonus training material

  • Water Management Checklist training
  • HVAC Contractor Checklist training

Qualifies for Educational Credits

  • 18 hours of RESNET Professional Development Hours
  • 2.5 BPI Continuing Education Units

Cost Effective - only $299:

  • BER Members receive a 10% discount ($269)
  • Save an additional $50 by bundling both the ESMFNC Training Course and the ESv3/3.1 course at our discounted rate of only:
    • $495 for BER Members
    • $549 for non-BER Member

ENERGY STAR version 3/3.1 revision 11 training includes:

  • 6 video training modules
  • 4 Power Point presentations
  • Periodic quizzes to check for program comprehension

Simply click the registration button below to register for the ENERGY STAR v3/3.1 online HERS rater training and reserve your spot today.

Once registered, students will receive an email with a link and login information to access the ESv3/3.1 training modules, resources, and exam.

It is recommended, but not required, that students finish all training modules within 1 month. However, students will have access to the course for one year, or until the training program is complete.